We have managed the final paving surface is covered with plaster! My father and I now have the ramp between the garage and the house paved. In addition to this we have also confirmed the additional platform with patches and everything vibrated together.
This is what the outcome of today's day off:
We have on the flat surface at an intermediate course, part of the patch is removed and installed new, as are the present without fixing the joints become too large.
right bottom of the image is still an iron plate is visible. This we have built a support for the pavement surface to obtain a lateral boundary.
have after all this work we have put the two remaining blocks of stone behind the new platform, so that I can now fill up the space and obtain a straight transition to the lawn. The setting of the stones was possible only with a lot of power and the use of iron bars.