Wella Koleston Color Chart The

addition behind the garage and paved parking set

Today my father and I have laid the pavement next to and behind the garage. However, this was only because my father has done all day yesterday preparatory work. He has condensed the ground, recycled material filled, full of soil, large stones went away and brought the flues. On Thursday, he has poured out the buried stones with concrete formwork. Without this input, we would not have the patch can create.

This morning we have begun to the split, which came last transport, with the barrow behind the garage. There was the split spread and leveled to remove the tubes. We then removed the whole area and started after lunch with the replacement.

Placing began to happen and after about 2 hours this was already done. We have still a few stones cut with the Flex and the joint is grouted to the garage with gravel.

The result of our work today is as follows:


I have dug up the debate nor the small surface area for the next platform, which is very back to see in the picture.