Today my father and I started to put the control edges behind and next to the garage. Today we have the rear set. We have taken first thing in the whole length of an appropriately deep ditch. Within this trench, we have at the beginning, middle and end of a control edge dug a pit to get more concrete under the edges. The whole thing looked like this:
have for this nearly 10-meter positioning edges, we mixed 10 bags of concrete floor and first set the control edges in the three concrete points and then set a concrete back on both sides.
Before setting the edge control, we have searched the landmark, as it is about 0.5 m below ground. In order to "extend" it, we have put an old granite landmark on the new, so as to mark the measurement point.
0 comments:
Post a Comment